Electrification & Renewable Energy Capability Statement
Explore our experience and engineering capabilities.
The EPI team has provided designs for both ground mount and rooftop photovoltaic systems, ensuring compliance with utility regulations, and is involved in the designs of thousands of electric vehicle charging stations at hundreds of sites, PRP Fleet Electrification projects, and Medium Duty/Heavy Duty EV Charging Infrastructure projects.
Engineering design of EV charging stations including accessibility requirements for public charging use. EPI has designed over 150 locations throughout San Diego and its counties, and including military installations.
The system includes PV modules mounted on parking canopies or integrated with the building and inverters. It some cases the PV system is provided with battery storage for capability to store power and ability to use at later time.
Naval Weapons Station, China Lake: EPI provided design of a ground mounted, photovoltaic (PV) system with a peak power generation capacity of 200 KW, paralleled with generator and battery storage in a conditioned building at Naval Weapons Station, China Lake. The system operates independently from the utility grid. In addition, EPI has provided electrical engineering and design serves for rooftop PV systems at multiple military locations including but not limited to: Twentynine Palms (97KW), Naval Base Coronado (200 KW).