Laguna SOCWA sewer lift station is use for transporting one million gallons of wastewater to a treatment facility. City of Laguna Beach maintains this facility. EPI is the prime engineer for this project and provided electrical engineering design for the replacement of existing 350kW generator with new 450kW generator for the City. EPI also provided design for the temporary generator connection to the existing transfer switch which will serve as backup to the site generator system.