The Muir Biology Building 3rd Floor renovation includes the complete demo and new work of 7,500 gross square feet (GSF) and a partial remodel of 1,500 GSF of the corridor within the overall 14,000 GSF floor area. The project includes the complete renovation of the research labs on the west wing of the third floor. The lab space had complete reconfiguration into an open lab. EPI performed an electrical design that includes new general and lab lighting, power, and data upgrades.