Substation Engineering & Design Capability Statement
Explore our experience and engineering capabilities.
EPI served as Engineer of Record for a 125MW/500MWh BESS, delivering substation upgrades, medium-voltage design, and detailed electrical studies including load flow, short circuit, and arc flash analysis. Our scope also included SCADA, communications, and tailored fire protection systems for BESS safety. Following this success, ENGIE awarded EPI two additional 50MW BESS projects with substation integration, reinforcing our role as a trusted partner in renewable energy and grid modernization.
EPI is providing full engineering and design services for two 50MW BESS facilities, each with collector substations stepping up from 34.5kV to 69kV for SCE interconnection. Our work includes transformers, switchgear, SCADA automation, grounding, and all required electrical studies. After successful 60% design delivery, ENGIE engaged EPI for future BESS and substation conceptual designs, underscoring client confidence in our expertise.
EPI delivered a major 69kV substation upgrade at Naval Base San Diego, adding new transformers, SF-6 breakers, switchgear, and SCADA systems to enhance reliability and capacity for the next 20 years. The project also mitigated demand charge penalties and ensured compliance with Navy–SDG&E interconnection requirements. EPI coordinated all civil, electrical, and protection elements, ensuring a safe, resilient, and future-ready design.
EPI designed and replaced four deteriorated substations at Naval Air Weapons Station China Lake, modernizing 34.5kV–15kV infrastructure with new transformers, switchgear, capacitor banks, and SCADA-ready controls. Our scope included grounding, protection coordination, and arc flash studies to ensure safety and compliance. These upgrades significantly improved system reliability for critical military operations.